CERTIFICATES of SANITIZATION
and
WARRANTY PROGRAM
PROTOCOL #1—LIGHT MOLD REMOVAL PROTOCOL
STEP 1. PRE-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform Pre-screening and determine the Project’s Protocol then submit a request for the project to qualify for a CERTIFICATE OF SANITIZATION.
STEP 2. APPLICATION OF Anti-Microbial
Application of Anti-Microbial for mold removal will be done only by a NORMI certified CMI, CMR, or NTP. The HVAC system must be cleaned.
STEP 3. APPLICATION OF APPROVED PROTECTANT
Application of Approved Protectant will be applied to all surfaces including the HVAC system.
STEP 4. POST-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform the Post-screening. Submit the Application for CERTIFICATE OF SANITIZATION including all lab reports and photos to NORMI by e-mail or fax.
STEP 5. NORMI CERTIFICATE OF SANITIZATION ISSUED
After receiving the above data NORMI will issue a CERTIFICATE OF SANITIZATION to the building owner providing it approves of the Project Coordinator’s Final Protocol Report.
© 2004 - 2006 Copyright National Organization of Remediators and Mold Inspectors. All rights reserved
PROTOCOL #2—HEAVY MOLD REMOVAL PROTOCOL
STEP 1. PRE-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform Pre-screening and determine the project’s Protocol then submit a request for the project to qualify for a CERTIFICATE OF SANITIZATION.
STEP 2. REMOVAL OF MOLD
Mold removal or remediation will be done by a NORMI Certified CMR. Application of NORMI Approved Enzyme Cleaner for mold removal will be done only by a NORMI certified CMI, CMR, or NTP. The HVAC system will be cleaned if necessary.
STEP 3. APPLICATION OF APPROVED PROTECTANT
Application of NORMI Approved Protectant will be applied to all surfaces including the HVAC system.
STEP 4. POST-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform the Post-screening. Submit the Application for CERTIFICATE OF SANITIZATION including all lab reports and photos to NORMI by e-mail or fax.
STEP 5. NORMI CERTIFICATE OF SANITIZATION ISSUED
After receiving the above data NORMI will issue a CERTIFICATE OF SANITIZATION to the building owner providing it approves of the Project Coordinator’s Final Protocol Report.
© 2004 - 2006 Copyright National Organization of Remediators and Mold Inspectors. All rights reserved
PROTOCOL #3—STANDARD RESIDENTIAL PROTOCOL
STEP 1. PRE-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform Pre-screening and determine the project’s Protocol then submit a request for the project to qualify for a CERTIFICATE OF SANITIZATION.
STEP 2. GENERAL and HVAC CLEANING
Sanitization of HVAC will be done by a NORMI Certified CMI or CMR. The HVAC system will be cleaned by whatever method may be necessary depending on the level of contamination.
STEP 3. APPLICATION OF APPROVED ANTI-MICROBIAL AND PROTECTANT
Application of Approved Protectant will be applied to all surface touchpoint (as needed) and fogging is required.
STEP 4. POST-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform the Post-screening. Submit the Application for CERTIFICATE OF SANITIZATION including all lab reports to NORMI by e-mail or fax.
STEP 5. NORMI CERTIFICATE OF SANITIZATION ISSUED
After receiving the above data NORMI will issue a CERTIFICATE OF SANITIZATION to the homeowner providing it approves of the Project Coordinator’s Final Protocol Report.
© 2004 - 2006 Copyright National Organization of Remediators and Mold Inspectors. All rights reserved
PROTOCOL #4—NEW CONSTRUCTION PROTOCOL
STEP 1. PRE-SCREENING
The CMI or CMR will perform Pre-screening and determine the level of contamination in the building, then submit a request for the project to qualify for a CERTIFICATE of SANITIZATION.
STEP 2. DRY-IN STAGE
In preparation for the CERTIFICATE of SANITIZATION, the process must begin at dry-in stage AFTER windows and doors are installed but BEFORE drywall is installed.
STEP 3. APPLICATION OF APPROVED PROTECTANT
Application of Approved Protectant will be applied to all surfaces including the HVAC system.
STEP 4. POST-SCREENING BY NORMI CMI OR CMR
The CMI or CMR will perform the Post-screening. Submit the Application for CERTIFICATE OF SANITIZATION including all lab reports and photos to NORMI by e-mail or fax.
STEP 5. NORMI CERTIFICATE OF SANITIZATION ISSUED
After receiving the above data NORMI will issue a CERTIFICATE OF SANITIZATION to the building owner providing it approves of the Project Coordinator’s Final Protocol Report.
© 2004 - 2006 Copyright National Organization of Remediators and Mold Inspectors. All rights reserved
PROTOCOL #5—COMMERCIAL PROTOCOL
This protocol is currently under review and evaluation. When completed it will provide a basis CERTIFICATE of SANITIZATION protocol for commercial environments like convenience stores, grocery stores, and other commercial application.
© 2004 - 2006 Copyright National Organization of Remediators and Mold Inspectors. All rights reserved